
TOS WHT 110/130
For multi-operation machining with optional automatic pallet changing.
ExploreMultiple operations in a coordinated production system.
Request a quoteAutomatic tool changing reduces manual intervention between operations.
Assess palletisation together with setup time and batch production requirements.
Prepare a tool list, workpiece cycle and dimensional inspection plan.

For multi-operation machining with optional automatic pallet changing.
ExploreHorizontal machining from gearbox housings to large frames. Machine selection starts with the component and production task.
ExploreFirst a stable process. Then automatic loading.
ExploreTechnical TOS selection by clamping, mass, work envelope, production and operations. The result is an enquiry direction, not an automatic model assignment.
ExploreYou do not need a machine model or part number. Describe the task and gather the information needed for engineering selection.